Turnkey construction of 100 km road including earthworks, substructure, superstructure, asphalt pavement, bridge works (6 no), culverts, snow galleries (2 no), retaining walls, gabion walls, geotextile works, rip rap, drainage structures and road furniture.
First 70 km is in low altitude flat terrain, the last 30 km is at high altitude in mountainous terrain. Hot in summers, cold in winters. High traffic volume.
Financing: World Bank
Consultant: Louis Berger Group, USA