CHARIKAR TO BAHARAK ROAD (PANJSHIR VALLEY ROAD PHASE 1&2, 70 KM)

PROJECT OVERVIEW
EMPLOYER
UNOPS for USAID in Afghanistan
LOCATION
Charikar/Afghanistan
PROJECT DETAILS

Turnkey construction of 70 km road, 2 lanes of 7.3 m total width and 1 m width shoulders at each side; including earthworks, substructure, superstructure, DBST pavement (50 km) and asphalt pavement (20 km), bridge works, culverts, retaining walls, gabion walls, geotextile works, rip rap, drainage structures and road furniture.
First 20 km is in low altitude flat terrain, the last 50 km is at high altitude in mountainous terrain. Hot in summers, cold in winters.
Consultant: Louis Berger Group, USA 
Financing: USAID