Turnkey construction of 128 km road (Section A -77 km, Section B-51 km), 2 lanes of 7.3 m total width and 2 m wide shoulders at each side, including earthworks, substructure, superstructure, asphalt pavement, bridge works (17 no), culverts, retaining walls, gabion walls, geotextile works, rip rap, surface and subsurface drainage structures and road furniture.
Adverse climatic conditions. Extremely mountainous area with high altitude. High traffic volume.
Financing: Japan Bank for International Cooperation (JBIC)
Consultant: Japan Overseas Consultants Co. Ltd.