Turnkey construction of 70,000 ton/year acrylonitrile plant; including construction, structural steel manufacturing and erection, equipment erection, mechanical, electrical and instrumentation works and commissioning.
The scope of contract covered; 30,000 m3 earthwork, 29,970 m2 formwork, 16,307 m3 concrete, 10 ton precast concrete, 14 atmospheric tanks (803 ton) and 1,077 ton structural steel manufacturing and erection, 39,500 m piping and 1,550 ton equipment erection, 725 units of instrumentation, 136,000 m2 painting, 6,325 m2 equipment and 9,000 m2 pipe insulation.
Process design and engineering: Badger/England