İŞVEREN
FARKLI ÜLKE
YILI AŞKIN TECRÜBE
FAALİYET ALANI
Construction of a gold mining plant nearby Copler Village 120 km west of Erzincan; including civil and concrete works, heap leach works and structural steel erection works. The contract was executed in a joint venture with Tekyol (Entes 51%).
GUELMA 1.100 DAİRELİ TOPLU KONUT
GUELMA 654 DAİRELİ TOPLU KONUT
GUELMA ÜNİVERSİTE KAMPÜSÜ
AZZABA 1.100 DAİRELİ TOPLU KONUT
ÇİMENTO DEĞİRMENİ, ÖN ISITICI VE DEPOLAMA TESİSLERİ
ÖZEN İŞ MERKEZİ – BLOK 1
MARSAN KİREÇ TESİSİ
BATMAN HAM PETROL UNİTESİ